Facebook
Twitter
LinkedIn

Machine startup steps

Machine startup steps:

(1) Turn on the main power control switch on the electrical box.

(2) Turn on the main power switch (air switch). At this time, the POWER LED on the operation panel lights up, indicating that the power is on.

(3) Press the CNC POWER ON button on the operation panel. At this time, the CNC is powered on, and the CNC POWER power indicator LED on the panel lights up.

(4) Release the emergency stop button and press the MACHINE RESET button on the operation panel. At this time, the panel lamp self-test CNC READY indicator light-emitting diode lights up.

(5) Press the reset button of the frequency converter (on the side of the operation box) to turn off the spindle alarm light. Note: When turning on the GNC, do not hold down any button on the CRT/MDI panel before the GNC is powered on.

Request For Quote

small_c_popup.png

Let's have a chat

Leave your information, our sales will contact you as soon as possible!