Installation of CNC machine tools: the main content of foundation construction, machine tool in place, connection assembly, and machine tool power-on test

The installation of CNC machine tools includes foundation construction, machine tool in place, connection assembly, and machine tool power-on commissioning.

1. Foundation construction and machine tools in place
Contents: Process preparation, technical preparation, connection of electrical and hydraulic pneumatic pipes of the machine tool.

2. Connection assembly
(1) Connection of external cables: connection of the system and each unit, grounding and three-phase power supply.
(2) Confirm the voltage and frequency, and check the phase sequence.
(3) Check the connection and eliminate the hidden danger of short circuit.
(4) Turn on the CNC cabinet.
(5) Parameter setting and confirmation.
(6) Setting of hardware short-circuit rod and switch.
(7) Parameter setting. The main thing is verification.
(8) Backup of parameters.
(9) The interface between the system and the machine tool: be familiar with the technical knowledge of system debugging and detect the status of the machine tool through the interface.

3. Power-on test run
(1) Preparation for power-on: cleaning, lubrication, and coarse adjustment of geometric accuracy.
(2) The process of the first power-on: all or part of the power on at one time.
Precautions: Safety issues Machine operation status.
(3) After the power is normal, check the contents: manual feed, spindle, handwheel, limit switch, and zero action.